Cancel or Change an Order
Last updated:
Ordered a Medium when you meant a Large, or spotted a typing mistake in the crew name for a personalized tee? This page explains how to cancel or change a Field and Reel order, how long you have and what happens to your money. Because every shirt is made to order, the window is short.
Cancellations and changes at a glance
- Window: 12 hours after you place your order, as long as production has not started.
- How: email support@fieldandreel.com with your order number and the change you need.
- What we can change: size, design, personalized text, quantity, shipping address, or cancel the whole order.
- Cost: free within the window.
- Refund for a cancellation: issued to your original payment method within 7 calendar days after we confirm the cancellation.
1. Why the window is 12 hours
Your order goes into production soon after it is placed. Once a shirt is printed it cannot be changed, so we can only edit or cancel an order before that point. Send your request as soon as you notice the problem; we confirm by email whether the change was made in time.
2. How to ask
Email support@fieldandreel.com from the address you used at checkout. Put your order number in the subject, and write the exact change: the new size, the corrected text exactly as it should be printed, or the full new address.
3. Personalized text
We print the crew name, coordinates, year or family name exactly as you typed it. You see the text in your cart, at checkout and in your order confirmation email: please read it there. A correction is free within the 12-hour window. After production starts the text cannot be changed; the Returns & Exchanges Policy explains your options after delivery.
4. Address changes
An address can be corrected free of charge until the order goes into production. After that we ask the carrier to redirect the parcel, but carriers do not always accept a redirect.
5. After the window
An order that is in production or has shipped cannot be cancelled. Once it is delivered you have 60 days to return or exchange it under the Returns & Exchanges Policy.
6. If we need to cancel
If we cannot produce or ship an order, for example because a size is unavailable or personalized text breaks our Terms of Service, we email you and refund the order in full within 7 calendar days.

